construction

The parking lot construction at Howland High School is almost completed.  All of the parking spaces, which originally lined Shaffer Avenue, are being relocated into the new parking lot. The new lot will be for visitor and staff parking. The old parking spaces are being converted into a drop off lane. All vehicles will travel the same direction to enter the drop off lane, which is adjacent to the sidewalk - allowing students to avoid being dropped off on the road and having to cross traffic.